Case Study
Temporary Window Vents
Worthington house.jpg
Worthington House, Monocacy National Battlefield
Location Frederick County, Maryland
Owner

National Park Service Antietam National Battlefield

Sharpsburg, Maryland
Built mid 19th century
Project data
Project date 1983
Affected materials louvers
Treatments placing temporary window vents on historic windows
Products used louvers, replacement of sills and jambs and related masonry work, painting, and installation of screening and blocking
Project team
Contractors Williamsport Preservation Training Center National Park Service

Located on the grounds of the Monocacy National Battlefield, the Worthington House is a mid. 19th century ell-shaped brick farmhouse. Judging from the modest exterior, it is rather surprising to find that the building contains noteworthy interior stenciling. The two front rooms on either side of the center stair hall and the stair hall itself all have remarkably intact examples of trompe l'oeil stenciled paneling combined with an egg and dart motif frieze border. The National Park Service acquired the 282 acre Worthington property in 1982, principally to protect this detached portion of the battlefield from intensive development. At the time of acquisition, the farmhouse was vacant and severely deteriorated with extensive water damage occurring as a result of major roof leaks and a predominance of broken and missing windows. Vines and saplings were growing up through the building and roof, destroying the mortar and displacing the bricks. The one-story porch across the front had collapsed, causing noticeable dislocation of the front masonry wall. In several areas large numbers of the handmade brick had been scavenged from the exterior, leaving gaping holes in the bearing walls. With no immediate use planned for the building, it was necessary to repair and stabilize the structure or lose it to deterioration. Work was undertaken using limited funds to make the building structurally sound, weathertight, and less vulnerable to vandalism. Rather than using traditional mothballing techniques, which rely heavily on temporary measures and the introduction of non-historic elements, the project team utilized high quality but cost-effective stabilization measures whenever possible to ensure the long-term preservation of the historic building. Temporary features, such as window vents, were designed and installed in such a manner as to be reversible and to cause little additional loss of historic fabric.

Contents

[edit] Preservation Problem

Situated on a very windy knoll, the Worthington House had several immediate preservation problems. The interior was waterlogged. Rain entered through broken and missing windows and through the deteriorated slate roof. At the time of acquisition, the structure had been occupied sporadically for approximately 10 years by vagrants and had received no upkeep at all. Rodent and insect infestation was also contributing to the deterioration of the structure. Early work focused on the need to make the building as weathertight as possible, yet allow for adequate ventilation. Consideration was given to devising a solution that would incorporate the window work with a passive ventilation system. It was recognized that if the house was tightly sealed with insufficient ventilation, the building would be particularly susceptible to condensation and moisture damage, Another factor to consider was that the building would remain unheated and unoccupied for an undetermined length of time. Neither boarding over the openings nor installing full sash throughout would provide optimum ventilation on the interior. This would be required to deter fungal decay of the wood and to avoid condensation damage to plaster walls and to their decorative stencil work. Hot daytime temperatures followed by cold nights in the spring and early fall could result in significant condensation damage to the plaster and stencil work. Damage would be particularly acute when nighttime temperatures fell below freezing. Furthermore, the hot moist air of the long Maryland summer would create problems, since high humidity can present a favorable condition for fungal growth. This is particularly true when the drying effect of air movement, normally induced in an occupied building, is not present. The potential for damage in these circumstances was great. Once wood absorbs enough moisture from the hot humid air and if fungal attack begins, the process of wood decay would enable the fungi to maintain the wood in a wet condition since fungi reduces wood to water and carbon dioxide. While such moisture problems could arise throughout the house, the basement was particularly susceptible to such damage due to moisture infiltration through the dirt floor, the below grade location, and seepage through the walls and basement doors. Special care should be taken to provide sufficient ventilation in unoccupied historic buildings to deter fungal decay and condensation damage.

[edit] Preservation Solution

Since the stabilization plan did not call for the installation of either a heating or a mechanical ventilation system, the solution to the air circulation needs was to install window vents. The basic rule-of-thumb used by the project staff for determining the amount of open air needed for good air circulation in this building is to use 50 percent of the sash units for ventilation. This approach has been successfully used by the Williamsport Preservation Training Center in previous projects. Depending upon individual conditions, some adjustment needs to be made based on the layout of rooms, interior walls, door locations, and number and location of stair shafts and windows. Because cross-room ventilation was desirable, the location of the ventilating louvers was critical. With proper planning, natural ventilation could be induced through the chimney or updraft effect within the building by which warm air raises and escapes through higher level vents, to be replaced with cooler air entering at lower levels.

Figure 1. Full louvered vents were installed in all single-sash openings in the basement because of the more severe moisture problems present in that location.

Good air movement would also tend to equalize interior and exterior temperatures, thus lessening condensation problems within the brick wails and on interior painted plaster surfaces. The window louvers had to be located so as to promote cross-room ventilation and avoid stagnant air pockets in the rooms. Furthermore, improvements to the appearance of the exterior of this long neglected building were desired. Efforts were taken, therefore, to locate as many of the louvers as possible on side and rear elevations, thereby minimizing the visual impact on the front elevation. Full double-sash vents could be placed in some side and rear windows to permit more glass on the front elevation. Even the glazing in the reconditioned or replacement windows would help to facilitate air movement within the building, since the sunlight passing through the glass would heat inside air and cause it to rise out through upper floor level vents. Cooler air entering through the basement windows would replace the warmer air. A survey of the building's 31 window openings established that on the first floor all but one sash were either missing or beyond repair. Altogether, only about one-third of the individual sash units were repairable. Most of those that were reconditioned required muntin replacement. In order to save on the final production costs involved in repairing or constructing the 52 individual sash units, all sash work was completed in one shop operation. The louvered vents were temporarily installed in lieu of the glazed sash on the bottom half of most window openings as part of the mothballing and stabilization efforts.

[edit] Louvered Window Vents

Figure 2. Section of the wooden louvers shows the simple manner in which they were made and assembled.

Wooden fixed louver vents were custom-made and installed. The easily fabricated louvers were sized to fit the lower sash opening 34 1/2" wide by 34 1/4" high on the first floor, while those for the smaller second floor windows were only 25 1/4 high. Full units were installed in all single-sash basement windows, since the window area was much less and the moisture problems more severe (see figure l). At the same time, the three attic windows were also replaced with full louvers to encourage thorough multi-level ventilation. Custom-built wooden louvers were selected over stock, pre-fabricated metal vents for the following reasons: most pre-fabricated vent systems would require modifications of the historic jamb in order to get a secure fit; a single style metal unit could not be found to fit the variety of opening sizes and the depth of the jamb; costs would be greater than making the custom units; and most important, it was felt that the thin gauge metal units offered little or no deterrent to unlawful entry. The wooden units presented a more secure system, The louver frame was designed to fit snugly into the existing sash tracks and simultaneously to secure the glazed upper sash. An added benefit of the 6 stock width is that it provided a fairly rigid - and thus secure - louver frame. The louver frame was constructed of 1 x 6 shelf grade northeastern white pine; the louver slats were made from 1 x 8 pine (see figure 2). The spacing of the louver slats did not exceed 4 in order to provide additional lateral strength (and security) to the frame. The relative closeness of the slats also would make it more difficult to kick out the grade level units. The slats were set into the frame at a 45 degree angle by routing a 1/4 deep dado cut into the jamb of the louver. The exposed edges of the slats were plumb cut in order to create a water drip on the exterior. Prior to assembly, the louver members were primed using an alcohol base paint in order to get at least one protective coat on all surfaces. After assembly, they were given one shop coat of oil base exterior house paint. A final coat was applied afterinstallation. For aesthetic reasons. the paint color used on the sash and trim was selected for the final coat on the louvers (see figure 3). In order to secure the vents in place, common 6d galvanized box nails were driven through the louver jambs into the sash tracks of the historic window jambs. To keep the jamb and stops from being damaged by the louver installation, temporary blocking was set between the parting bead and the inner and outer stops (see figure 4). By attaching the vents in this location, little damage was done as the nails were driven into the sash track rather than an exposed portion of the jamb. Once the building is returned to use, the lower sash will be installed and the nail holes will be filled with wood putty. Since the nails were driven in on the interior of the building, nearly 3 from the exterior wall, adequate security was achieved without driving the nails all the way in. Thus it will be relatively easy to grab onto the nail heads and back them out when the vents are eventually removed.

TN11 Fig4A.jpg Louver drawing.jpg

Figure 4. The lower sash (left) were removed to permit installation of the louvers. To minimize damage to historic fabric in installing the louvers, temporary blocking was set between the parting bead and stops prior to nailing the units in place (right). After the louvers were secured in place, 1/16 mesh copper wire screening was installed on the interior of the louver frame using a l/2 square wood frame. The screening is an integral part of the louver design. This seemingly minor detail was necessary to prevent the recurrence of insect, bird, and rodent infestation (see figure 5). The 1/16 mesh was specified to keep out the ever-present mud-dauber wasp, whose hive-building instincts have no regard for historic plaster or paint.


The cost of constructing and installing the louvers in 27 window openings was around $ l ,800, including 17 full size louvers, 7 basement and 3 attic units. This work was undertaken concurrently with the construction and installation of the reconstructed window sash and repairs to the frames, sills, jambs, and surrounding brickwork. The total cost of the window work was less than $9,000, involving 3l window openings.

Figure 5. Screening was attached to the back side of the louvers to prevent the recurrence of insect, bird, and rodent infestation.

[edit] Project Evaluation

The window louvers installed in the Worthington House have proven effective over the past two years in providing the necessary ventilation for the building (see figure 6). Neither fungal attack nor condensation damage has recurred, and the interior air lacks even the typically humid, musty odor typically found in many older buildings. The louvers provide for good air movement within the building and a greater equilibrium between interior and exterior humidity levels and air temperatures, thus helping to protect the historic plaster and the significant interior finishes. The installation of the louver system in conjunction with the other sash work, and the overall exterior stabilization work has stimulated an interest in finding a use for the structure. As a temporary solution to a complex set of problems, the louver vents in the Worthington House have resolved a variety of issues. When used together with additional weatherproofing measures, this venting solution can be adopted for use in other buildings being mothballed.

WorthingtonHouse.jpg

Figure 6. The window louvers installed in the Worthington House have proven effective over the past two years in providing the necessary ventilation for the building.

[edit] Project Data

Project Cost: Material and labor for construction of the 17 full size, 7 basement and 3 attic louvers was approximately $1,800. The material and labor cost for reconstruction of the sash, including glazing, painting, sizing and installation was around $5,200 (roughly $100 per sash unit), involving 21 pairs of double-hung sash and 7 basement and 3 attic windows. All other related work for the 31 openings, including sizing and installation of the louvers, repair to window openings (repair/replacement of sills and jambs and related masonry work), painting, and installation of screening and blocking cost between $1 ,000 and $2,000. Total window costs for complete sash and the louvers as well as installation and finish work was between $8,000 and $9,000.

Public domain Original source: http://www.nps.gov/tps/how-to-preserve/tech-notes/Tech-Notes-Windows02.pdf